Our Projects

Explore our projects to see how Ortus Energy delivers fully funded on-site renewable energy solutions at scale, helping energy-intensive businesses reduce costs, improve resilience, and unlock long-term value across their estates.

Iceland Deeside
kWp at site
1125.74
kWh clean energy generated/per annum
961,844
tonnes of CO₂ saved in year 1
170

Atlas Copco Deeside
kWp at site
1,402.98
kWh clean energy generated/per annum
1,186,508
tonnes of CO₂ saved in year 1
210

GE Rugby
kWp at site
474.37
kWh clean energy generated/per annum
391,166
tonnes of CO₂ saved in year 1
60

Bentley Phase 1
kWp at site
2159.09
kWh clean energy generated/per annum
1,781,033
tonnes of CO₂ saved in year 1
320

Amber Green Park Phase 1
kWp at site
975
kWh clean energy generated/per annum
931,466
tonnes of CO₂ saved in year 1
160

Amber Green Park Phase 2
kWp at site
495
kWh clean energy generated/per annum
474,498
tonnes of CO₂ saved in year 1
84

Ascot Racecourse

kWp at site
608
kWh clean energy generated generated/per annum
569,137
tonnes of CO₂ saved in year 1
100

CAE Burgess Hill
kWp at site
1058.21
kWh clean energy generated/per annum
1,006,220
tonnes of CO₂ saved in year 1
170

Testimonials

Proven in Practice

Behind the Scenes:
Ascot Racecourse

“The PPA model essentially means that Ortus fund the capital investment into the installation which means that Ascot don't have to provide any capital up front, it just made sense from an economical point of view.”

Stuart Rider, Estates manager, Ascot

The installation at Ascot is one of UK sport’s largest rooftop solar installations. Comprising of more than 1,200 solar panels, with a total capacity of 608kWp, the system has been designed so that almost 100% of the electricity generated is used on-site.

This off-sets around 9% of Ascot’s annual electricity consumption.

The result: A 608kW solar system delivering measurable cost savings and improved sustainability performance.

“This marks another important step in the racecourse’s sustainability journey.”

King Charles III

Behind the scenes at Atlas Copco

Behind the Scenes:
Atlas Copco Deeside

£100k annual savings

We went on-site at Atlas Copco Deeside to hear from those leading energy strategy on the ground.

In this Ortus Energy special, Alex Bell (General Manager) and Elle Bryan (SHE Engineer) share how rising energy costs—and the need for greater independence from the grid, prompted a shift in approach.

The conversation explores:

  • The real impact of energy price volatility on industrial operations
  • Why on-site generation is becoming a strategic priority
  • How a fully funded PPA made the project viable, where capex may not have

The result: £100k annual energy savings and greater control over long-term costs.

At a time of increasing energy uncertainty, this is a clear example of how businesses are building resilience through proactive energy strategy.

Why Ortus

Why Ortus

It amet consectetur adipiscing elit duis tristique. Nulla aliquet enim tortor at. Eget nulla facilisi etiam sumitut est dignissim diam quis. Varius duis at consecteturer lorem.

Lorem Ipsum

Nulla aliquet enim tortor at. Eget nulla facilisi etiam sumitut est dignissim diam quis.

Lorem Ipsum

Nulla aliquet enim tortor at. Eget nulla facilisi etiam sumitut est dignissim diam quis.

    Contact Us

    Get in touch with our team today

    Whether you’re exploring solar for a single high energy-use site or a multi-location portfolio, we’ll assess your estate and outline the opportunity.

    We’ll provide a clear view of energy savings, carbon reduction, and how a fully funded PPA could work, without obligation.

    Proud to be part of part of